Thursday, July 5, 2007

Demolition - Day 2 (Tuesday)


The crew came in to finish up any demolition and start installing the overhead lights. Instead of letting the wires hang loosely, they drilled through the boards to run the wires through. It looks much more organized, but I asked our contractor if this will affect the solidity of the foundation of the second floor. I guess the vision of me falling through the ceiling came to mind. He said that there is a percentage of the board that they can drill through and they are well within that percentage.


The old cabinets are still out on the front porch.




I hope our neighbors are not disturbed by all the noise and mess.




No comments: